05/14/2026
Just a few overdue project pics on Mr. Solis’ F150 before it heads out for additional firewall massage and a quick exhaust job. We repurposed as much as we could from his previous setup along with incorporating as many of his own requested items. We welded some mounts to a fuel cell he brought us and plumbed it all in Fragola PTFE with a Fore hat, twin pumps, and added some ID1300’s. We also wired up the fuel system and repaired a bunch of poor splices found all over, replaced some broken connectors, swapped injector connectors to EV6, and re-loomed where needed. He’s also running a JC midplate with an upgraded Trick intercooler and a JLP Power Flow plenum setup for his 2.9L Whipple once the firewall gets clearanced further back. He’s picking up the truck to get firewall corrected and supposedly get some exhaust attached to the ARH headers we added v-bands to. Soon after it returns, should be ready to fire up and start getting this one tuned and out the door! Stay tuned..