02/28/2026
A look back on the last 20 days. Built a 100 “ Twin Cam out of an 88. Rebuilt the forks, primary drive, carburetor, replace front and rear Brake system, replaced front and rear wheel assemblies installed new tires all on a shovel head.
Stripped down a 60 Panhead down to the bare frame. Rebuilt the bottom end,then did the top end today. Started building another Panhead motor, Did a 30 K service on a Roadglide, changed 6 tires. Repaired a 5 speed transmission. Did a handle bar swap out with internal wiring. Changed handle bars and risers and re- wire a street Bob. Removed the wiring from the Groundshakers Custom shovel and custom made a different wiring harness. Stripped down a 91 FlHS and converting it over to a Custom RoadKing, new RoadKing front end, top end, Handle bars, transmission repair install a cam and breather assembly, rebuild the carb, install a chrome nacille which covers the risers and handle bars but add a tach and speedo somewhere also come up with turn signals.
Also did a top end on my Brother Freeway’s shovel chopper. And that brought us to today Today I installed the push rods and adjusted the valves. Ran the external oil lines. Rebuilt 2 carburetors, finished up stripping the 03 Dyna wide glide we are about to rebuild. Took in a 2010 ultra with electrical issues like starting by it self and switches doing other functions than what it was designed for. Oh almost forgot also a 20 K service by Monday.
Yea it’s been a typical Bike week month and we haven’t even got started yet