Calico Jack Ventures

Calico Jack Ventures Professional Captain Services
Commercial and Instructional Diving Services

Travis & Joanne Scott

More than 35,000 miles offshore together

Extensive knowledge of the Caribbean, Florida and the Florida Keys

30+ years in the local marine industry

Licensed and Insured


Qualifications:

USCG 200 Ton Master of Tow

STCW

Radar

BRM

HELM

ACAPT

AUX Sail

PADI OWSI 95065

Repairing the main ramp to the fuel dock at a local marina.
07/15/2026

Repairing the main ramp to the fuel dock at a local marina.

07/12/2026

We were called out for a simple prop replacement on a small sailboat. Upon closer inspection, we noticed that the cutlass bearing was not only worn, but also separating from the shaft log. This was in addition to old electrolysis damage to several of the blades on the prop. Simply changing the propeller in-water would not have solved his vibration problems. Since we're not in the business of taking people's money for no reason, we recommended that he replace everything during his next haulout.

Following our annual inspection, we replaced 1400ft of mooring chain at a local marina.
07/08/2026

Following our annual inspection, we replaced 1400ft of mooring chain at a local marina.

A busy holiday weekend with 2 small dockside sinkers.Photo contributions by Sam M.
07/06/2026

A busy holiday weekend with 2 small dockside sinkers.
Photo contributions by Sam M.

Due to the bottom substrate, we had to return to two of the three locations with different equipment to finish the job.
07/04/2026

Due to the bottom substrate, we had to return to two of the three locations with different equipment to finish the job.

These are the Manta anchors we've been installing up in Marathon.
07/02/2026

These are the Manta anchors we've been installing up in Marathon.

06/28/2026

Using a hydraulic jackhammer to drive in the Manta anchors at Sombrero Reef off Marathon.

Moving on to Sombrero Reef off Marathon where we'll be installing 8 new public-use anchor pins. We try to get out here e...
06/26/2026

Moving on to Sombrero Reef off Marathon where we'll be installing 8 new public-use anchor pins. We try to get out here earlier as it tends to get very busy -even on a weekday.

06/22/2026

Still working at Coffin's Patch Reef off Marathon. Sometimes we're working over sensitive hard coral structure so we have to carefully lower the equipment into the water, then use lift bags to float everything to the work site. At other times, we're over a nice sandy bottom, directly over the work site. Here's Dave with his "briefcase" on his way to the "office" (gotta love that landing!). This tube is filled with about 50lbs of drive steels that we use for the manta anchor installation. Note: Do not try this unless you can equalize your ears with no hands!

It looks like chaos, but this is the end of a successful day. We started the install of Manta anchors out at Coffin's Pa...
06/18/2026

It looks like chaos, but this is the end of a successful day. We started the install of Manta anchors out at Coffin's Patch Reef for the National Marine Sanctuary. Over two days, we'll be installing 6 anchors here.

Address

Stock Island, FL

Alerts

Be the first to know and let us send you an email when Calico Jack Ventures posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Calico Jack Ventures:

Share

Category