05/29/2026
Night access in hits differently. 🌃
Overnight waterproofing and glass panel sealing at using our 250-ft operated aerial lift.
Nearly 170 ft above street level.
Approximately 75 ft of side outreach.
Right along the curved upper façade overlooking one of NYC’s busiest intersections.
This is why many complex façade operations happen overnight:
less traffic, fewer disruptions, cooler conditions, and safer access in dense urban environments.
Our basket-mounted 70W halogen work lights kept the work zone fully illuminated high above Columbus Circle throughout the operation.
Because at this level, access is not just about height.
It’s about precision. Positioning. Planning.
And the operator behind the controls.