08/31/2026
This week I was able to get one step closer to finishing a one bedroom unit on Mifflin St.
When we bought this place, this bathroom subfloor was spongy and the shower was ruined among the rest of the deferred maintenance. With the floor torn out I was able to fix the subfloor with new OSB & replace the shower, vanity and flooring.
After we sand and refinish the living room + bedroom floors it will be ready for rent 😁