08/29/2026
Lots of work has been done on the stang, test fitted some wheels and tires for clearance, more body work, etc. main things we’ve done is sprayed the car with epoxy primer for a protective layer, stripped basically the entire car down getting closer and closer for final bodywork and paint, and almost completing the powertrain! Just put on the dual disc centerforce clutch, and married the trans and engine together finally! Should be ready for test fit here soon, very excited for that! Thank you Papa for everything you’ve done to the car too, couldn’t do it without you.