Noack Marine, Inc

Call Directions Website Contact the business

Noack Marine, Inc specializes in onsite/lakeside services identifying and resolving problems in electronic and mechani

specializes in onsite/lakeside services identifying and resolving problems in electronic and mechanical issues, weatherization and spring/summer ready.

10/13/2026
10/03/2026

Moderate flooding now forecast on the Llano River in Llano after isolated heavy rain in the Hill Country early Saturday.

LCRA plans to reopen floodgates at Wirtz & Starcke Dams later Saturday 10/3.

10/02/2026

UPDATE (9:57 PM): The floodgates at Wirtz and Starcke dams are now closed.

There are currently no floodgates open at any LCRA dams, but that could change with significant additional rainfall or runoff.

__________

UPDATE (1:45 PM): Floodgates are open at Wirtz and Starcke dams. Flows will be fast and water levels will be higher than usual downstream of the dams.

The floodwater will be moved downstream through the dams into Lake Travis, which has risen more than 2 feet over the last few days and is expected to continue to rise.

__________

UPDATE (Saturday October 3, 10:26 AM): LCRA expects to re-open floodgates at Wirtz and Starcke dams Saturday afternoon. LCRA closed the floodgates Friday evening, but overnight rains in the Hill Country require additional floodgate operations today.

The floodwater will be moved downstream through the dams into Lake Travis, which has risen more than 2 feet over the last few days and is expected to continue to rise. The Hill Country has seen significant rainfall over the last week, with many areas receiving 3-5 inches of rain, and some areas receiving more than 8 inches. LCRA encourages the public to remain alert to local conditions and be prepared to take actions to protect people and property.

http://www.lcra.org/flood

__________

UPDATE (6:24 PM): Floodgates at Wirtz and Starcke dams are now closed. No floodgate operations are underway at this time, but LCRA continues to release storm runoff through hydroelectric generation at one or more of the Highland Lakes dams. With additional rain in the forecast, conditions remain dynamic and LCRA may need to open additional floodgates along the Highland Lakes over the weekend.

Sign up for Flood Operations Notification Service (FONS): https://www.lcra.org/FONS

__________

UPDATE (7:40 AM): Floodgate operations are underway at Wirtz Dam and Starcke Dam to pass floodwaters from the Llano River downstream into Lake Travis.

http://www.lcra.org/flood

__________

UPDATE (October 2, 1:25 AM): LCRA has opened a floodgate at Starcke Dam and expects to open a floodgate at Wirtz Dam later this morning to pass floodwaters from the Llano River.

__________

⚠️ UPDATE (10:27 PM): LCRA expects to open floodgates at Wirtz and Starcke dams Friday morning (Oct. 2) to pass floodwaters from the Llano River downstream. Flows downstream will be fast and water levels will be higher than usual downstream of the dams. Take action to protect people and property.

REMINDER: Wirtz Dam creates Lake LBJ and Starcke Dam creates Lake Marble Falls. The runoff will flow from Lake LBJ into Lake Marble Falls and then into Lake Travis.

__________

UPDATE (3:48 PM): We continue to release storm runoff through hydroelectric generation at one or more Highland Lakes dams. No floodgate operations are planned at this time.

__________

UPDATE (9:54 AM): We're releasing storm runoff through hydroelectric generation at one or more Highland Lakes dams. No floodgate operations are planned at this time.

Conditions can change quickly with more rain or higher inflows. We are closely monitoring conditions and encourage the public to remain alert to local conditions and be prepared to take protective actions.

More info: http://www.lcra.org/flood

__________

Heavy rain fell across the Highland Lakes watershed overnight, with up to 6 inches in some areas. More rain is expected in the coming days and flooding is possible. We will be closely monitoring inflows into the Highland Lakes and will be prepared to pass stormwater downstream as needed.

More info: http://www.lcra.org/flood

10/02/2026

LCRA manages Highland Lakes flood operations using realtime data to reduce flooding in Austin and downstream communities along lakes Buchanan, Inks, LBJ, Marble Falls, Travis, and Austin

10/01/2026

RIVER FLOOD BREWING IN THE HILL COUNTRY

The Llano River is officially climbing in Junction due to 2-5"+ of rain since midnight. This guarantees that a swell of flood water will be heading downstream over the next couple of days, but we won't know just how big that swell is until the rain has moved out and we see a crest on the river gauges.

The Llano River moves through Mason and Llano counties before entering Lake LBJ. That water will need to be passed down to Lake Travis where it will be stored until Lake Travis reaches 100% capacity (currently 90% capacity) so it's possible we have floodgate operations along much of the highland lakes at some point this weekend. This is what I warned you about days ago.

Anyone who lives along the Llano should monitor conditions closely today. You can do so at hydromet.lcra.org

09/30/2026

With heavy rain in the forecast, now is a good time to sign up for LCRA's Flood Operations Notification Service (FONS).

Receive a notification by text, email or phone call: lcra.org/FONS

08/27/2026

Why is the Lake Austin drawdown happening in fall instead of winter?

Historically, lake drawdowns took place in the winter. But after Winter Storm Uri in 2021, we changed that approach to help ensure hydroelectric generators at dams along the Highland Lakes are fully available during the cold winter months.

During extreme winter weather, electricity demand can rise dramatically and other power sources can be affected. Keeping the lakes at normal operating levels helps ensure LCRA can generate hydropower if needed to support grid reliability - helping keep power available for Texas homes, businesses and essential services.

That’s why planned lake drawdowns now take place in the fall.

At the request of the City of Austin, we will draw down Lake Austin from Oct. 12 through Nov. 30, 2026, to allow shoreline property owners and City departments to perform needed maintenance.

08/20/2026

PLANNED LAKE LOWERING ALERT
At the City of Austin Government's request, LCRA plans to temporarily lower Lake Austin this fall to give property owners time to repair shoreline structures, dredge boat slips, remove debris and manage nuisance vegetation.

📅 Starting Oct. 12 the lake will be lowered up to 1 foot per day - up to 10 feet total
🚤 The City plans to close public boat ramps along Lake Austin and prohibit swimming at Emma Long Metropolitan Park during the drawdown
💧 LCRA plans to refill the lake Nov. 24-30

More info: https://www.lcra.org/news/news-releases/city-of-austin-and-lcra-announce-planned-lake-austin-drawdown-this-fall/

07/27/2026

Address

5521 Hi Line Road
Hudson Bend, TX
78734

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Telephone

(512) 790-2628

Alerts

Be the first to know and let us send you an email when Noack Marine, Inc posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Noack Marine, Inc:

Shortcuts

Share

Category