Tony Jewell Performance Fabrication LLC

Tony Jewell Performance Fabrication LLC Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Tony Jewell Performance Fabrication LLC, Motor Vehicle Company, 103 E Main Street, Hamersville, OH.

01/04/2024

I have accepted a job offer and have decided to close the business as of December 31st 2023. Thanks to all of you that supported me for the last 5 years. There are several factors that influenced me to make this decision, one of them being simply the fact that I cannot provide good enough service to my customers to satisfy my expectations of the business. I have had, on average, a 20 person waiting list since 6 months in. I cannot handle that work load. I’ve been buried for 4 1/2 years and just can’t get to everybody. By the time I do everything involved with running the business in a day, I average 4-5 hours of actual shop time….that’s only 20-25 hours a week. Expanding the business into a larger building, adding more equipment, and trying to hire talented fabricators, is not a task that I am willing to take on. It’s simply too much for one man to do, I’ve wore my cape for 5 years and tried, but it’s simply just not a good plan. Also, if I were to stay in business for 2024, my health insurance is going to be $900/month, and it increases every year…again, not a good plan lol. I could have pushed on this year and continued, but after some health issues, I would have started the year with the waiting list backed up about 2 more months. So, I have decided to go back to having a “real job” again, which I think will be an easier life lol. I do plan to continue to do some work on the side, depending on my work schedule. Again, thank you for your support.

Check these headers out 😎…. 2 1/2” primary, 4 1/2” collector polished stainless steel. Had the polisher come in and poli...
10/04/2023

Check these headers out 😎…. 2 1/2” primary, 4 1/2” collector polished stainless steel. Had the polisher come in and polish everything to assure complete coverage after I made all of the tubes, then I assembled them afterwards. Polishing work is on point and was done by Perfectly Polished.

Had a hatchback fox body in for a rear firewall last week
07/28/2023

Had a hatchback fox body in for a rear firewall last week

Well there’s a first time for everything, and this is the first time I’ve ever put a trailer hitch on a race car! 😁. The...
07/26/2023

Well there’s a first time for everything, and this is the first time I’ve ever put a trailer hitch on a race car! 😁. The Chevy II Gasser project will see some drag n drive type events and needed a trailer hitch/parachute mount.

07/26/2023

For the Chevy II Gasser project I had to design a front end mounting system that would tilt and/or lift off. Also it was requested to make it function without having to cut the rear of the fenders in half, so it has to slide forward about 4” before it can be tilted in order to pull that off. Here’s a quick look at the front end mounting system.

Another set of stainless headers finished.  2 1/8” primaries , 4” collectors, forward facing with bull horns on this gre...
07/10/2023

Another set of stainless headers finished. 2 1/8” primaries , 4” collectors, forward facing with bull horns on this great looking SBC powered Mustang. Thank you Shawn Barton and Bryan Barton for your business!

No fans on and one door shut to stop the breeze from blowing through the shop….it’s hot welding today!🥵🥵🥵
07/05/2023

No fans on and one door shut to stop the breeze from blowing through the shop….it’s hot welding today!🥵🥵🥵

06/16/2023

The Chevy II gasser project is going to be run in drag n drive type events. I was asked if I could make the passenger seat easily removable and to tilt forward to allow access behind the seats for storage….No problem 😎

I have the roll cage updates finished on the gasser project. Seats, belts, steering column, etc. next on the agenda…
05/11/2023

I have the roll cage updates finished on the gasser project. Seats, belts, steering column, etc. next on the agenda…

I have the under floor structure finished on the gasser project, and I got a pretty good start on the roll cage updates ...
04/14/2023

I have the under floor structure finished on the gasser project, and I got a pretty good start on the roll cage updates this week.

You have to build the foundation before you build the roof…
04/01/2023

You have to build the foundation before you build the roof…

Hard at it on a Friday night, but that’s what it takes to be “Employee of the Month” for 51 consecutive months!🏆😎😜😆
04/01/2023

Hard at it on a Friday night, but that’s what it takes to be “Employee of the Month” for 51 consecutive months!🏆😎😜😆

Address

103 E Main Street
Hamersville, OH
45130

Telephone

+15133174028

Website

Alerts

Be the first to know and let us send you an email when Tony Jewell Performance Fabrication LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share