09/02/2026
Another one knocked out!
We wrapped up this storm sewer project in just 4 days from start to finish.
The existing storm sewer outlet was sluffing, so we pulled a few sections of RCP back, added a flat section, and dug a solid new foundation. From there, we installed geo fabric and riprap to build an outlet that’s made to hold up for years to come.
Our scope included:
• Excavation
• RCP replacement
• Geo fabric
• Riprap installation
• Restoration
• Final grading
• Hydroseeding
A lot of work packed into four days, and we’re proud of how this one turned out.
Jet Black Industries
Built right. Built to last. 👊🏼