Hofmann Investments provides detailing, design of steel, aluminum stainless steel art work sculptures, we do fabrication and erection engineering consulting services We are specialized in fabrication & welding of any metal project in stainless steel, mild steel, Aluminum. CNC-Plasma services, punching, bending and fabrication of special parts modern design, art deco, art Sculptures, and crafts. Fabrication of Screens, Staircases, Fences, Gates, Railings, Louvers and more. We Hofmann Investments LLC bring your imagination to life.

10/16/2026

Most of the conversation right now is about steel prices and lead times. Here's a supply risk that hasn't made it into many procurement plans yet.

The United Steelworkers' contracts with U.S. Steel and Cleveland-Cliffs expired October 1. Both companies have been operating on rolling 48-hour extensions ever since. USW reported bargaining with Cleveland-Cliffs was taking a break, with talks scheduled to resume in Pittsburgh on October 28. No deal has been announced.

Why should GCs and developers care? A work stoppage at major integrated mills would tighten an already tight market and put pressure on prices. Mills were running near 80% utilization in AISI data for the week ended September 26. Plate lead times were at record highs in the October 1 SMU survey, and distributor inventories are reported well below last year's levels.

We're not predicting a strike. We are saying: plan for the scenario.

If your steel package for Q4 or early Q1 isn't bought out yet, this is one more reason to move before October 28 rather than after. If plate or sheet is part of your misc metals scope, confirm where it's coming from now, while sourcing is still a conversation instead of a crisis.

GCs and developers: has steel labor risk made it into your project risk register, or is it still off the radar?

10/13/2026

Structural steel risk doesn’t end when the order is placed. What happens when the allocation gets cut?

AGC’s October 2–9 data digest reports a firm order reduced by more than 75%, with no rolling date provided. Prices are up $600–$700 per ton since early September, and fabricated product for projects over 300 tons can carry 6–12 month lead times.

When supply changes mid-project, the next steps matter: re-sequence shop work, look at alternate mills or available stock, release connection material and base plates earlier, and pull forward site tasks that don’t depend on the steel. A date change alone doesn’t keep a project moving.

GCs and developers: Is your steel order on allocation, and what’s your plan if it gets cut?

10/12/2026

South Florida’s 2027 construction pipeline is filling in, and the practical question is capacity.

Swire has broken ground on The Residences at Mandarin Oriental on Brickell Key. Rilea has started Mohawk at Wynwood, and Ocean One is underway in Boynton Beach. Recent financing closings total $436 million across multifamily and condo projects, while Mercedes-Benz Places is advancing with a $1.1 billion financing package.

For GCs, developers, and project teams, this is a volume story, not a pricing story. As more work moves forward, fabrication shop slots and miscellaneous metals capacity can get absorbed early. Confirm your structural steel and misc metals scope, and check shop capacity well before buyout, not at release.

What projects do you have coming up, and have you checked fabrication capacity yet?

10/12/2026

Railings, stairs, ladders, grating, embeds and other miscellaneous metals can hold up punch lists and closeout when they’re treated as an afterthought.

For GCs, developers and property managers, it helps to manage the misc metals package alongside structural steel: confirm scope early, review shop drawings with enough time for coordination, and settle coating decisions before the schedule needs them.

A little planning up front can help prevent late surprises on site. When do you typically bring the misc metals package into the project schedule?

10/08/2026

For GCs and developers: the December window for steel work closes earlier than the schedule suggests.

Between Thanksgiving and New Year, the entire chain tightens at once: shop drawing approvals, galvanizing and powder-coat queues, trucking and delivery windows, crane time, site access, and inspections. Many shops also lose working days to holiday shutdowns.

That means the real deadline for buyout and approvals may land weeks before your winter milestone date.

The practical move is to work backward now from the date your steel needs to be installed, inspected, or ready for the next trade. Build in time for approvals, finishing, delivery, and site coordination before the holiday slowdown begins.

What is your winter milestone, and when are you targeting steel work to be complete?

10/08/2026

Steel mill prices moved on October 1-and the timing matters for projects still waiting on a buyout.

Nucor-Yamato and Gerdau increased beam prices by $50 per ton. Nucor increased heavy structural sections by $100 per ton. Plate moved up $60 per ton, and the November orderbook is already open.

The practical takeaway: mills are staying firm on price. If your steel package is not bought out yet, this is the week to move.

Confirm your tonnage, review the current mill pricing, and involve your fabricator before pricing and production schedules are locked. Waiting can affect both budget and schedule as the next orderbook fills.

Is your project’s steel package bought out yet?

10/01/2026

Steel work can be ready, and still hold up the schedule.

For Florida projects that require threshold or special inspection, the special inspector needs to be lined up before structural steel is covered or the next phase begins. Miss that window, and a concrete pour, enclosure, or occupancy approval may be delayed.

The inspection may include steel size and location, connections, bolts, welds, anchors, and other items required by the approved plans. It happens at the right points in the sequence: during fabrication when required, in the field after er****on and connections, and before work is concealed.

The fabricator’s shop QC records help keep this moving. Fit-up checks, weld inspection reports, and mill certificates give the inspector clear documentation instead of creating a paperwork hunt at the job site.

This is not a step to leave until the steel truck is arriving. Build it into the schedule early and confirm who is responsible for calling the inspector.

GCs and developers: is special inspection already built into your steel schedule, or is it still being handled at the last minute?

09/29/2026

Galvanizing is becoming a schedule item, not just a finish choice.

Recent market feedback reported severe supply strain on galvanized product on September 16, with galvanizers running at full capacity.

That affects more than structural steel. Railings, stairs, embeds, grating, and the rest of the miscellaneous metals package may all need coating before they can ship.

For GCs and developers, decide early whether the project calls for galvanized, powder coat, or a duplex system (galvanized plus paint). The coating route can affect fabrication planning, shipping, and installation dates.

If the finish is still undecided, it may already be a schedule risk.

What finish are you specifying on your next project: galvanized, powder coat, or duplex?

09/29/2026

Data center construction is absorbing a growing share of structural steel supply.

Industry forecasts point to roughly 5.5% production growth in 2026, driven largely by data-center and electronics demand. Some structural steel sections are already being quoted 40–50 weeks out.

For GCs and developers, the concern is bigger than mill availability alone. When major buyers absorb mill capacity, regional fabrication shop capacity becomes an important factor in protecting your project schedule.

Planning 2027 work? Check steel availability and fabrication shop capacity early: before drawings are complete. Early coordination can help identify risks while there is still time to adjust procurement and scheduling.

GCs and developers: Are you already reviewing steel availability for your 2027 projects?

09/19/2026

Steel availability is becoming a schedule risk for 2027 work.

Mill lead times lengthened again this month, reaching multi-year highs. The September 17 SMU survey reported approximately 7.6 weeks for hot-rolled coil and more than 9.3 weeks for plate. Spot tons are scarce, contract tonnage is being reduced, and some mills are placing buyers on allocation.

This is not a pricing post. It is a planning post.

For GCs and developers, the practical steps are simple: confirm required tonnage early, reserve fabrication shop capacity before schedules tighten, involve your fabricator before drawings are 100% complete, and build project schedules around realistic mill and fabrication lead times.

If you have structural steel or miscellaneous metals work planned for 2027, now is the time to review material requirements and procurement timing. Early coordination can help protect your schedule before steel availability becomes a problem.

What 2027 projects are you planning, and have steel tonnage and fabrication slots been discussed yet?

Address

5320 Unit #5 And 5420 Unit 10&11 W State Road 84 And Reese Road
Davie, FL
33314

Opening Hours

Monday 6am - 3:30pm
Tuesday 6am - 3:30pm
Wednesday 6am - 3:30pm
Thursday 6am - 3:30pm
Friday 6am - 3:30pm

Telephone

9543479465

Alerts

Be the first to know and let us send you an email when Hofmann Investments, LLC modern wood & steel construction services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Hofmann Investments, LLC modern wood & steel construction services:

Shortcuts

Share