07/07/2026
Good evening everyone! Just a quick update for you all!
First, we would like to apologize as we are incredibly sorry if we have not gotten back to your calls, texts or messages recently. We will be in touch with you soon!
Second, we wanted to give you a peek at the renovation that has been going on at the shop. Some of you may be aware that the back floor, where the lift is located, had started to Crack. Due to the danger that this would pose if we did not address it, we made the decision to reflect the back half of the shop. This required long days and late nights to move all everything out of the back half, break up and remove the concrete, regrade the ground and pour a new floor. After pouring, it takes time to fully cure before we are able to reinstall and utilize the lift. While it is all apart, why not take the opportunity to do some deep cleaning?!
We will have to be careful with what jobs we take in through the end of the month. We truly apologize for the inconvenience but safety is our top priority. Please be patient with the process! We look forward to seeing you all soon!
Last, but certainly not least, we can not give enough thanks to everyone that helped this process go so incredibly smoothly. Whether it was to lend ideas/expertise, equipment and/or manpower to make this happen, we are truly grateful for everything!