05/30/2026
This was a fun project to be a part of. A pipeline running beneath the river needed repairs, but first access had to be created. The solution required building a temporary bridge to move equipment back and forth while damming off half of the river at a time to complete the work safely and efficiently.
Using trench boxes, retired railroad cars, and our M100 rotator, our team was able to help construct the bridge from one bank to the other and help make the project possible.
Sometimes the best solutions aren’t found in a book—they come from experience, teamwork, and thinking outside the box.
When others say can’t, we say on our way.