Safe Harbor Front Street

Call Directions Website

Safe Harbor Front Street Yacht construction, repair, refit, service, marina and storage in mid-coast Maine. Front Street Shipyard is a premier yacht yard in mid-coast Maine.
(224)

As the largest, most capable yacht yard in the Northeast, Front Street Shipyard builds, repairs and refits boats of all sizes. The marina hosts local boaters and transient yachts. Indoor and outdoor storage is available during the off-season.

Work is piling up for our 3D five-axis waterjet cutting machine.
10/18/2026

Work is piling up for our 3D five-axis waterjet cutting machine.

A well-positioned soft patch is allowing us to move all the appliances out of a vessel that's starting a major refit wit...
10/16/2026

A well-positioned soft patch is allowing us to move all the appliances out of a vessel that's starting a major refit with us.

First step in paint prep: removing all the deck hardware.
10/14/2026

First step in paint prep: removing all the deck hardware.

A broken foot isn't slowing down our purchasing manager.
10/08/2026

A broken foot isn't slowing down our purchasing manager.

Systems Tech Dave Marks and General Manager JB Turner are both speaking in seminars this week at IBEX in Tampa, Florida....
10/06/2026

Systems Tech Dave Marks and General Manager JB Turner are both speaking in seminars this week at IBEX in Tampa, Florida. Dave shares his expertise in upgrading legacy vessels with NMEA backbones, while JB joins a panel exploring how work variety supports a healthy bottom line.

We're really happy to have STONEFACE back in the yard. She underwent an extensive refit with us not long after we first ...
10/02/2026

We're really happy to have STONEFACE back in the yard. She underwent an extensive refit with us not long after we first opened the yard. She's been kept in beautiful condition ever since.

The new stern post, horn timber and dead wood on LOUISA.
09/30/2026

The new stern post, horn timber and dead wood on LOUISA.

Replacing engines on our second MJM 36 with the Volvo D4 short block.
09/26/2026

Replacing engines on our second MJM 36 with the Volvo D4 short block.

450 yards of concrete getting poured to extend our marine hoist pad.
09/21/2026

450 yards of concrete getting poured to extend our marine hoist pad.

Congratulations to our friends at Worden Marine on the grand opening of the new Worden Marine Innovation Center in North...
09/17/2026

Congratulations to our friends at Worden Marine on the grand opening of the new Worden Marine Innovation Center in North Andover, MA, where they showed off the TruSolar40 solar-powered water taxi we built.

Address

101 Front Street
Belfast, ME
04915

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm

Telephone

(207) 930-3740

Alerts

Be the first to know and let us send you an email when Safe Harbor Front Street posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share

Category