06/10/2024
Cyclone by Heartland. This unit and its subframe were severely water-damaged. We resealed the entire unit and the roof to prevent this unit from having any future leaks. The customer requested that we build the slide room floor from scratch. Disclaimer: We do not specialize in building slide-room floors. The customer requested this, and we aim to please our customers. The water lines and toilet bowl fl**ge were re-aligned to install new toilets and marker lights. While removing the damaged hydraulic slide room floor, we discovered the floor subframe needed repairing before we could even begin installing the new slide floor.