10/13/2026
The first frame took 8 months , mostly building parts in volume, getting parts in volume, figuring it out for the new frame. These are pics of the second frame, and it only took 8 days instead. 1 truck is at the graphics shop, second is going to powder coaters, and another one is at a paint and body shop. I'm tired, because I was unsupervised.