01/11/2025
Big Changes for a client going into 2025... Here is a description and overview of the project with photos of Part 1.... a work in progress
2015 JKU
⚙️Starting a 1 ton swap with Dobinsons MRR 12" and 14" coilovers
⚙️Super Duty Swap with a Dana 60 Front with ARB and Sterling rear with E-locker
⚙️ Motobilt Back Half Kit, Fuel Tank Relocation and Four Link
⚙️Front will be getting an Artec 3 Link
⚙️ PSC Hydro Assist and Artec Hi Steer Kit to run 42" Pats on Dirty Life Beadlocks.