22/06/2026
Just 7 days from measurements to a race-ready car.
For this Ferrari, we carried out the measurements, prepared the print files, produced the graphics, and completed the full vehicle wrap within a very tight schedule.
Measurements — 1 day
Printing — 3–4 days
Vehicle wrap installation — approximately 6 hours
As a result, the car was fully prepared and ready for the race right on schedule.
When deadlines are tight, every stage of the process must be carefully planned and executed. Projects like this highlight the importance of experience, precision, and attention to detail.
Website:
https://wrapanddetailinghub.pt/en/
WhatsApp:
https://wa.me/351912804759
https://www.instagram.com/wrapmasters.pt
Apenas 7 dias desde as medições até ao carro pronto para a corrida.
Para este Ferrari, realizámos as medições, preparámos os ficheiros para impressão, produzimos os grafismos e efetuámos a aplicação completa da decoração num prazo muito reduzido.
Medições — 1 dia
Impressão — 3–4 dias
Aplicação da decoração — cerca de 6 horas
Como resultado, o automóvel ficou totalmente preparado e pronto para a corrida dentro do prazo previsto.
Quando os prazos são apertados, é fundamental planear e executar cada etapa com rigor. Projetos como este demonstram a importância da experiência, da precisão e da atenção ao detalhe.