02/10/2026
Another major project underway for DRDC, and one we’re extremely proud to have secured.
This contract involves some serious civil infrastructure work, with the team working in trenches approaching 3 metres deep and dealing with all the challenges that come with working around existing underground services. The next phase will see us move out into the carriageway to install around 200 metres of 125mm water main and 225mm stormwater main.
For me personally, this project has also been a bit of a milestone.
This is one of the first big projects where I haven’t been personally involved on the tools every day. For a long time, I thought I had to be there doing the work myself to make sure everything was done right.
But I’ve got to say, I’m extremely proud of our team.
The leadership from our senior guys and the effort from our younger guys has been awesome to watch. They’ve absolutely smashed out some challenging work, including trenching down to nearly 3 metres deep — the sort of work I once struggled to trust anyone else to take on without me being there.
Well, they’ve certainly shown me what they’ve got.
Seeing the quality of work they’re producing and the way they’re stepping up gives me a lot of confidence in where DRDC is heading. The future is looking strong with the team we have coming through.
It’s also pretty awesome standing back and seeing all our machinery lined up in photos like these. A big thanks to Aoraki for taking the photos and capturing the job.
There’s still plenty of work ahead as we move into the next phase, but judging by what the team has achieved so far, they’re more than ready for it.
Great job, team. Keep smashing it. 👏
And a special thanks to our General Manager, Jessica Crooks, for everything she does behind the scenes to keep the company, the team and our projects moving forward.
Very proud of what this team is achieving. 💪