Buildupz Garage

Buildupz Garage Just a bunch of guys that appreciate this hobby of cars.🫡

H A P P Y N E W Y E A R Bye bye 2021…2022 will be changing things if covid good to us..🤙🏼TB: Ooo how I love a type r…90%...
03/01/2022

H A P P Y N E W Y E A R

Bye bye 2021…2022 will be changing things if covid good to us..🤙🏼

TB: Ooo how I love a type r…90% finished…on to the next.✌🏼










Okeh…been to long now ,no more days off.lots of little things to do so let’s finalise the plan & get it done.Always puts...
15/08/2021

Okeh…been to long now ,no more days off.lots of little things to do so let’s finalise the plan & get it done.

Always puts a smile when I see this bay.defs separate itself from the other ITRs.











15/07/2021

Just a light 1 2 3 action on the stock ITR after doing the repairs & test driving.👍🏻










Long time since I’ve posted on here.been real slack & lazy.just got to comfortable on acc.but I’m looking to turn away f...
15/07/2021

Long time since I’ve posted on here.been real slack & lazy.just got to comfortable on acc.but I’m looking to turn away future customer work & just concentrate on my own projects.👍🏻

But I’m back ,finally put some work on the customers stock ITR.been parked up for long time waiting for me to fix its bad oil leak issue.

So today I pulled off the oil cooler to find out the o ring was so old & hard.had 2 small cracks.causing it to leak a lot while the system had pressure.

Replaced with oem Honda o ring & torqued down oil cooler to oem spec.had to replace IM gasket also as i always do the job from the top much easier for me.

Nothing big today but I do have 1 more job left that I’m looking to finish off hopefully soon then I’ll be getting into my own projects.stay posted guys.😎











20/03/2021

Hey guys,

Here’s some update on customers DC2R.been hella delay but took a break from it as we had to clean up the wiring to get it running 100%.

So this car ran a G4 link with coil pack setup on the old setup.so had to go through the wiring in cabinet & clean it up as we had issues with signal for dizzy.

Can finally say it’s running on all 4 cylinders & idling perfect.note , we are not wiring gurus but I think we not that bad at aswell ..🤷🏽‍♂️

Couple few things to do & we should be able to actually go for a good drive on it before it goes back.😁









Slowly but surely... few things done on the DC2R build not close to finishing but getting one step closer. .co defs got ...
27/01/2021

Slowly but surely... few things done on the DC2R build not close to finishing but getting one step closer. .co defs got busy getting bumpers painted ,just the black areas to be done that’s left.

- Catch can supplied & fitted.
- Clutch line oem / braided steel & clutch slave done.
- Linkages back on with front hardrace bushing.
- ITR flywheel cover fitted with correct hardware.
- T bracket on with all correct hardware / washers.
- Suspension & wheels done.
- Front bumper , grill , rear filler piece , rear 98spec bumper , tail lights test fitted so bumpers are gonna be pulled back off for few areas to go black.

Couple little things to sort out & waiting on alot of parts to come, so we can finish up the motor & get it to start hopefully this weekend.





Update post on the DC2R build:After so long it’s finally painted , .co got busy yesterday.well not fully but almost.just...
24/01/2021

Update post on the DC2R build:

After so long it’s finally painted , .co got busy yesterday.well not fully but almost.just front , rear bumpers + side skirts left to do.
co & been hella busy with it.now this week we looking to button up rest of the motor things & fingers crossed get it running.






Update post on the DC2R Build:So here we have is the DC2R build replacement motor.After months waiting on hand injury to...
16/01/2021

Update post on the DC2R Build:

So here we have is the DC2R build replacement motor.

After months waiting on hand injury to come right.today the team helped out getting the motor prepped up & helping out getting it cleaned , brushed down , resprayed.

Replaced the following:
- Cambelt.
- Tensioner.
- Waterpump.
- All o rings.
- Rear main seal.
- Bottom end seals + gasket.
- Inner cam seals.
- Valve cover gaskets complete set.
Etc etc..

Mated the gearbox with new spigot + release bearing but re using the flywheel & clutch kit which in still in good condition.

Motor looking a lot better now & fitted all the zinc coated bolts , washers , brackets etc.giving it that nice finishing look.

Thanks team .co , .getting closer as we speak.






Here’s some more update on the DC2R build for a customer.Under body arches getting some well needed attention.team is re...
16/01/2021

Here’s some more update on the DC2R build for a customer.

Under body arches getting some well needed attention.team is really getting busy with this car.

All things take time to get it where you want it to be & make customer happy.






Address

Manukau
Auckland
2023

Website

Alerts

Be the first to know and let us send you an email when Buildupz Garage posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Buildupz Garage:

Share

Category