Zlin Norden-Edge CUB EP918Ti LNEDG Sharing the build progress, operations and experiences with the Norden Zlin cub.

This weekend I managed to make up some nice ASA mounts for VFR Night LED lights. There are 3 red forward-facing for the ...
08/11/2026

This weekend I managed to make up some nice ASA mounts for VFR Night LED lights. There are 3 red forward-facing for the pilot, one for the co-pilot, and 3 white LED for the cargo compartment in the aft fuselage section. Also we installed and secured new stick grips with PTT, Trim and Slats control. Fuel pumps also got wired.

All the small details are coming along while we build the wiring harness on the wall template.

The goal now is to have it airworthy by spring. Although I didn’t say which spring, the coming one seems reasonable now 🤞🏻

It’s actually starting to feel like 90% done, 10% to go now 😊

We are putting in the hours to get all the remaining electrical wiring done 👌🏻
26/10/2026

We are putting in the hours to get all the remaining electrical wiring done 👌🏻

The instrument panel, wiring and pod is finally completed and being installed into the airframe. Finally some progress a...
02/10/2026

The instrument panel, wiring and pod is finally completed and being installed into the airframe.

Finally some progress again 😊👌🏻

We’re back at it again and getting some work done. The integration of the instrument panel and cluster to the airframe i...
15/09/2026

We’re back at it again and getting some work done. The integration of the instrument panel and cluster to the airframe is up next. We’ve decided to make the cluster and panel fully detachable for ease of maintenance and serviceability in the future. More to follow.

Unfortunately the original windshield had developed cracks after sitting for some time, so we bought some high quality l...
21/01/2026

Unfortunately the original windshield had developed cracks after sitting for some time, so we bought some high quality lexane (PC) and a new one is being cut and installed.

Some more details, parts and fabrication done.
16/01/2026

Some more details, parts and fabrication done.

Tail beacon installed ✅
16/01/2026

Tail beacon installed ✅

Keeping the momentum up! Nav/strobe lights, custom anti collision beacon bracket for tubular fuselage installation, wiri...
14/01/2026

Keeping the momentum up! Nav/strobe lights, custom anti collision beacon bracket for tubular fuselage installation, wiring diagrams and schedules and panel wired 💪🏻😊

We got the brakes bled, wires run through the wings for nav/strobe lights, continued with the wiring schematics and moun...
06/01/2026

We got the brakes bled, wires run through the wings for nav/strobe lights, continued with the wiring schematics and mounted the pod for the governor controller.

Little by little it’s coming along now 😊

Today’s progress was installing the he AT-1 FLARM/ADS-B anti collision system and the Trig TY-91 COM. While doing some m...
04/01/2026

Today’s progress was installing the he AT-1 FLARM/ADS-B anti collision system and the Trig TY-91 COM. While doing some miscellaneous electrical wiring, I powered the cabin heat fan and was rather disappointed by its flow. I had a much stronger 70W SPAL fan which flows 520m3/hr, but how to fit it? Well that’s the beauty of modern RE with 3D scanners and CAD software. I drew up a shroud that would be a direct replacement and not require any modifications. Currently 3D printing in PA6-GF which will be plenty strong and can withstand 210c before getting soft.

Adresse

Merdevegen 4E
Notodden
3676

Varslinger

Bli den første som får vite det: Vi sender deg en e-post når Zlin Norden-Edge CUB EP918Ti LNEDG legger ut nyheter og kampanjer. E-postadressen din brukes ikke til noe annet formål, og du kan melde deg av når som helst.

Snarveier

Del

Kategori

Bilfirmaer i nærheten