Seager Engineering

Directions Website Contact the business

Seager Engineering Please WhatsApp your enquiry on 07880602012 between 9am and 5pm Monday to Friday so we can reply at our convenience...thank you
Pat & Jim

Seager Engineering provide machining services to classic vehicle owners, local motor-trade and industrial/marine companies.

A comprehensive range of specialist engine reconditioning machine tools allows us to provide repairs and standard recon to a very high standard plus complex casting repairs.
Services include:• Re-boring and re-sleeving of cylinder blocks and motorcycle barrels
• Crank grinding up to 60” in length
• Cylinder head/block facing with PCD/CBN tooling
• Valve seat work including lead free inserts
• Various crankshaft repairs
• Aluminium and cast iron welding
• Thread repairs by helicoiling, timesert or custom made
• Bearing housing re-sleeved to original postion and size
• Component supply for all modern leading brand engines
We supply spares for vintage and classic machines and manufacture our own for specialist applications.

We also supply modern and classics motorcycle engine parts. Contact us for more details or go to our online shop.

We have over the years provided industrial component reconditioning at both repair and re-manufactured level.

We can work with companies to provide a remanufactured part on an exchange basis so lead times can be reduced including manufacturing the spares required in small batch quantities.
Component material can be analysed to determine the type and quality so parts can be replicated or improved as required.
Typical components are shafts, bronze bearings, pumps, both water and fuel injection pumps. Contact us for more details

We can offer prototyping machining services
either from scratch using a sketch, drawing
or altered from another part.

Using all our machines we can machine and alter most
components and with our extensive experience and large
engineering contacts most things can be 'schemed' or
adapted/utilised from commercially available components.
We can accept electronic files with drawings such as .iges or .dwg - email us for more information.

Blasting your component to an 'as new' condition.

Whether your component is fragile or robust we can can give a brilliant sheen finish to either ferrous or non-ferrous parts.

This versatile process can give both a decorative finish, clean state and can be economically produced on a wide variety of used and new components.

Ultrasonic Cleaning
Effortlessly cleans places you just can't reach.

Ultrasonic Cleaning is regarded as a way of cleaning components which either have complex drillings or difficult to reach places.

Using soundwaves to cavitate air bubbles in the cleaning fluid, you can clean delicate and complex assemblies effortlessly with virtually no component risk.

Ultrasonic Cleaning
From carburettor's to cameras, crankshafts to clock parts, using a wide variety of fluids and temperatures and by adjusting the frequency great results can be achieved.

We now have a BLASTWASH BTW1350 and a VIXEN JETWASH 600 Aqueous Hot Wash which is loaded with an applied chemical caustic degreaser which is made intentionally for aluminium.

This cleans carbonised oil and dirt to a bright alloy finish. Stubborn dirt does need agitation but 80% cleaning is achieved within 10-20m cycle times.
It is primarily used as part of the engine reconditioning process, we keep it regularly maintained and also use it for cleaning components and tools etc...

Many materials such as copper, brass, steel and cast iron can be accurately machined and silver soldered together for a stong and reliable joint, eliminating leaks of air/fuel or hydraulic pressure.

SOFT SOLDERING: This process is mainly for small items where heat and distortion are to be kept to a minimum, examples include carbureter parts, decorative brass components, fuel or water pipes.

SILVER SOLDERING: This process is highly underrated and if performed correctly provides an incredibly strong joint. Strict clenliness and joint preparation are essential but many items can be almost invisibly joined. broken/cracked cast iron is one material that responds well to this type of repair.

BRAZING: Used for manufacture and provides an on-surface joint of reasonable strength many components are made by joining parts together and can be repaired by un-fusing, manufacturing a new section and re-joining.

Our MUREX 375 SQUARE WAVE TIG WELDER allows us to weld aluminium castings or fabrications as well as stainless steel, aluminium/phosphor or bronze either in manufacture or repair.

Other applications include stellite hard facing on rockers and other hard wearing parts, please contact for details. It also has a stick welding facility for cast iron, mild steel and stainless. With adjustable foot control for the amps and a fully adjustable current setting all materials can be welded.

Seager Engineering has a wide experience in aluminium castings for classic bikes and cars as well modern cylinder heads.

Components regulary repaired include: Crank-cases, cylinder-heads, gearbox casings, fuel pumps, bronze selector forks, fuel tanks and marine stainless steel fabrications.

Hard facing using stellite is a cost effective way of reclaiming work wear pads and followers, we also have grinding facilities to re-surface back to original.

Stick Welding
We can repair small cast iron parts with ease, but larger cast iron components require a more specialist approach and are best discussed on application. Please forward details for more information.

On-site welding and fabrications can be arranged through one of our engineering partners. Services include hard facing, structural welding and fitting.

MIG Welding
Our MIG welding capacity is mainly aimed at small fabrications and repairs but we can offer larger fabrications and on-site welding thru one of our engineering partners.

Please contact us for details.

Just a quick post to keep the ball rolling on this frosty Saturday morning… got to get brave for the morning dog walk …....
21/11/2026

Just a quick post to keep the ball rolling on this frosty Saturday morning… got to get brave for the morning dog walk …. A cooked breakfast in the cafe sounds a good way to start ..
Extremes of heat or the lack of it effect metal and this job shows how the correct liner interference is really important.. this let go in the height of our very hot summer!
now before you say “ it was done wrong at the factory.”
This Pre-unit Triumph 500 looks as if it’s still got the factory liners fitted, so they have been in 65 years plus some..
I doubt if they were incorrectly installed all those years ago but the parent bore has stress relieved probably due to to one too many heat cycles and let go enough to allow the liner to move up and down with the piston till the top hat cracked and then it broke the top bit went up and the liner dropped… that was just before the top part of the piston was ripped off as the ring expanded out into the gap…
Well it’s doable.. the head will be no problem and hopefully I will have a liner that will reinstate the 0.003” interference and we will replace both and remachine the recess and top gasket face to have the 0.005” protrusion that is required… but that’s a job to be done in the near future.. we have a few other 350’s and 500’s to finish off first
And a hearty breakfast to consume!😀😀😀😀

Triumph TR5 1973 head undergone a full overhaul and fin repairs and tidy up.. a nice head but had suffered bad handling ...
19/11/2026

Triumph TR5 1973 head undergone a full overhaul and fin repairs and tidy up.. a nice head but had suffered bad handling issues and had snapped fins and some poor welding.
Jim is off from tomorrow till a week Monday… on holiday … so I’m holding the fort, I’ve been sorting out quick replies on WhatsApp… that’s something I should have done ages ago… it will streamline the answering process and coupled with basic prices on all our common heads and case/crank jobs.. it will make the admin easier.. so I can email a estimate for the minimum and extras can be added if needed once we have it here and cleaned.
So this TR5 500 head is ready to fit with all new hardware and valves.. coldibro guides and a push over conversion.. the 1970’s triumph had push in exhausts which were not the best and can lead to air leaks, popping and banging out the exhaust, squeaks and puffs coming from the front of the head …. Bad enough in your trousers let alone on the bike aswell🤣🤣😂😂😂

So it’s already to go back to Canada

Poor ole Jacob the saluki had to have his teeth cleaned… and 6 teeth out… that’s the first dental he’s had, not bad for 91 human years or 13 dog years.. it’s the raw food he eats , crunching up all those chicken wings ,he got over the anaesthetic well but I was very anxious yesterday when he was under.. but he pulled through and although a little subdued he’s eating and trotting about.. that bill was £800.
Seems a lot but they have a staff of 60 and lots of equipment, huge premises and shed loads of experience and knowledge… you get what you pay for!
And that applies to everything including us!

One of the best parts of this job is the end result…This beauty has had a top end refresh which has made it a perfect st...
18/11/2026

One of the best parts of this job is the end result…
This beauty has had a top end refresh which has made it a perfect starter and runner. It’s a credit to the guy that assembled it and the owner who uses it for European tours.. thank goodness that these machines are still thundering around doing what they were designed to do.
F**k the cost it’s the journey and not the destination that matters.

Good on you Paul … hope it gives you as much fun and satisfaction as we did helping you… 👍👍👍👍

NORTON 650ss

Yamaha XT 500 This was stripped by the owner and we were tasked to remove all the bearings, thoroughly clean the whole e...
12/11/2026

Yamaha XT 500
This was stripped by the owner and we were tasked to remove all the bearings, thoroughly clean the whole engine and cerakote the casings .. refit new bearings supplied , recon the head and barrel, and possibly the crank.. well with the help of our hotwash and a bit of elbow grease, we stripped and removed the bearings and aqua blasted the insides of all the parts, washed and cleaned them ready for MT coatings and wheel building to go through his long process and cerakote these … now mark also buffs our dings and scratches before coating ..
the fins were polished on the ends as factory finish and when they come back, we de bead and clean again , checking every hole, oil gallery and crevice for media.. when we are satisfied the new bearings are fitted..
The head needed the valves faced and seats cut and a light face as these composite gaskets sort of corrode the alloy and 0.004” is enough to freshen the face and provide a good seal..
The barrel needs the liner to go back in and hopefully just honed, but the crank has had a bit of hammer rash on the alternator end and I think I will probably have to have it to bits and overhaul it… customer talk required.
But it all looks like new.. it’s a credit to marks patience and skill … how the f**k he masks so brilliantly I don’t know.. Yamaha would coat it all over then machine it…. But we cannot do that.. so it has to be masked before blasting and again before coating..
No costs yet because the job isn’t finished…

This week has been a struggle.Getting the electricians in to finally get power to the middle off the workshop so we can ...
12/11/2026

This week has been a struggle.
Getting the electricians in to finally get power to the middle off the workshop so we can finally get our TOS FNK25A Turret mill up and running … a belt change and it’s a thorough clean and oil and it will be a major asset to the shop. It has a powerful Newall digital readout to manage the 50” table with generous X and Y movement, 40 international spindle with all the movement and swivelling on the head that you can ever need… I’m looking forward to using it… further more we now will be able to get our Bridgeport Eze Trak reworked as a manual as the Cnc control was bolloxed .. as a Cnc it has chromed scraped slides and ball screws instead of conventional lead screws… 30international quick change spindle and again all the facility for angles and odd ball jobs..
We sold a Colchester Bantam and moved our chipmaster into its place… that’s having a birthday .. but I bought an excellent long bed bantam from a school and although like new.. the kids vandalised it, so a few new parts and we will have a pair of highly functional lathes one in metric and the other in imperial ex*****on.
New lights to illuminate the area and more sockets to facilitate the new H mill and our surface and T&C grinder.

Coupled with various problems and customer pick ups , the week has flown by.

But I have just finished this off tonight
Which I’m very pleased with.
Brand new Triumph 500 barrels and pistons.
These are finished in cerakote black out black in the elite series.( higher temp and tougher) these barrels are finished here to give 0.004” skirt clearance with these high comp squish band pistons ( T100ss not T100 R)
I managed to get a stock of new as in original Triumph rings and I gapped them to 0.010” … new tappet blocks and locking screws were fitted also..
all in all a very nice bit of kit now

The whole lot was £750

1976 Triumph T140 engine which is all very nearly finished.It needs the extra thin clutch plates so we can squeeze in 7 ...
07/11/2026

1976 Triumph T140 engine which is all very nearly finished.
It needs the extra thin clutch plates so we can squeeze in 7 plain and 7 friction… this makes for a lighter more grippy clutch.. we always rough blast the plain plates from new to give the extra grip.. it’s had a full strip and thorough clean … crank overhauled but the big ends only needed a polish , new steel rods, shells, sludge trap tube and plug, rebore, cerakoted barrels, new pistons with European rings all dynamically balanced and every bearing replaced along with every seal.. it will have all new stainless screws holding the freshly polished casings, head overhauled with colsibro guides, G&S valves , our anti reversal stubs , valve springs collets and retainers.. new primary chain, every internal bead blasted and scrupulous cleaned, new gearbox needle rollers, thrusts and needle rollers in the high gear, new oil pump, and a Pazon ignition system.. plus all new head bolts and every single bit that was rusty or bu**ered.
This bike was low mileage but just was left to corrode and was taken to bits and never rebuilt.. it wasn’t worn it was just scruffy.
But our instructions were to make it as new with enhancement to improve it.
The parts list is long but every item is low value but still that tots up to £1600… plus the labour and machining … it will be around £6500 when it’s finished..

I know people will say it’s not worth it, but that doesn’t detract from the effort that has be put in by myself and all of the parts manufacturers.
It’s with my and their help that these things can live on!
People like us and LF Harris buy raw materials and use expensive equipment to produce parts and use other engineering firms to sub contract services that they cannot do themselves … like hardening and grinding which are now specialist techniques where once upon a time was a “in house job” at most engineering manufacturers….
But that’s not the way it is now ..no longer great big factories working to produce a product from raw material to paint to assy.. just lots of little specialists all working together…
But that’s the way it is now.. gradually the only stuff worth doing is things that need little human labour other than the initial design or set up… hence why specialist one off jobs cost much more!

As usual we will assist all we can with final running up and be ready to help at any point in the future…. No faceless corporate company here..
Very Unlike the treasury minister Emma Reynolds who thinks business employers are NOT working people…
If you Google and ask “how many business are in the uk.
There are 5.7million 75% of those are non employing other than the owner!
Thats 4.25 million
And a staggering 99.85% are small to medium … to explain, micro is fewer than 10 employees, small is less than 50 and medium is less than 250..
I cannot believe that the owners just sit back and do nothing?😳😳😳😳
Now I know how much I have to do and need help but in a climate where you own Government actually despises entrepreneurs and regards them as non contributing to the effort just languishing in the filthy profits…
Errrrr No is the answer.. unfortunately the labour market is predominantly made up of unskilled and over entitled,who are ridiculously protected by laws which as an employer you take the risk of seriously being taken to the cleaners..
The risk out weighs the gains massively and most business I know agree..
And on that note … I’m off to the beach to walk my dogs and fish Aldeburgh Dirty wall.. hopefully bag up on Soles, whiting and dogfish.. hopefully a Thornback or a Bass..
it’s a good tide and is high at 10pm ..

Hope you enjoy the post..

This French Sherco FR300 cylinder head came in with valves not touching the seat by 1/2 a mill … the guy said it had no ...
03/11/2026

This French Sherco FR300 cylinder head came in with valves not touching the seat by 1/2 a mill … the guy said it had no compression…. No s**t!
But it was difficult to understand what had gone on, he owned it, a bike shop had stripped it, but the guides looked eccentric, the exhaust valves were bent… but it didn’t completely add up..
The Valve stems were 4mm diameter, and the guides when checked were eccentric … ie the inside dia not concentric with the outside diameter.
So we had to make new guides in colsibro… 4mm bore …44mm long..
We pecked them on the Cnc and then turned the outside inc the valve stem seal diameter all in one go and then parted off… tricky stuff to machine let alone a 11 times diameter deep hole 😳😳😳
But Jim and the HAAS lathe managed to get them so good … infact “bloody loverly” we had to import a 6mm top 4mm carbide pilot from the USA @ £500😳 and get from France the new valves, the inlets had 0.01mm clearance and the exhaust 0.02mm that’s 4 ten thousandths and 8 respectively of a inch… bu**er all.. then we cut the seats and faced it
That job was £1200 but a new head was a hell of a lot more … I don’t know but over £2.5k .

Still it’s all done now … jobs like this sherco are not our main stay… but j*p 4 stroke heads could be.. but we need that extra elusive person …. Keen, hungry and prepared to invest , buy in and become a new face… otherwise it ain’t gonna happen😳😳😳

Jim made a New batch of Norton spanner’s on the Haas super mini mill..That’s a fully Cnc 10 station tool change mill .. ...
03/11/2026

Jim made a New batch of Norton spanner’s on the Haas super mini mill..
That’s a fully Cnc 10 station tool change mill .. that is a pleasure to watch..
we stoned off the spinners and quickly blasted them before getting them anodised in Blue… the company colour..
pretty smart I think… just a shame we don’t have more parts like this to make on a regular basis because it can run whilst we do other stuff, it recovers our overheads and adds great value to the business.. I will hopefully one day soon have the time to develop more products to run along side our services… and make and sell regularly .
We might have to make time I reckon 😀😀

1967 TR6 650 Triumph .This engine has been done in stages and finally we have put it together, After initial strip and c...
03/11/2026

1967 TR6 650 Triumph .
This engine has been done in stages and finally we have put it together, After initial strip and clean, Aqua blast and checks on the cases ,the crank was fully overhauled… to our very clean standard and the big ends were good on std size, so it was polished and dynamically balanced for steel Hepolite rods , all new bits and pieces like new flywheel bolts and plug and tube. Brand new shells and new main bearings, the timing side had to have a tolerance ring fitted as the housing had stretched over time.
Two new cams, 70-3134 on the inlet and a 70-9989 half race cam on the exhaust.. new followers 70-3059R on the inlet and pressure fed 70-8801 on the exhaust..
ps the exhaust cam is nitrided and that’s a bonus…it had new tappet blocks and locking screws as it’s just foolish not to replace.
Rebored and honed to plus 0.040” with HARRIS 9:1 pistons and Goetze rings, every part aqua blasted and checked,inspected or replaced..
Replated nuts and studs etc,
As always there’s a s**t load of bits ( small bits) to be replaced..
We stopped at the short engine as the owner wanted to build the rest , we are happy for that as these engines absorb loads of time and still need fettling after they are finished and to be honest you need to be “ a competent tinkerer” to keep on top…with lots of care and patience and a nice garage and good tool kit… the same goes for Italian and American bikes…. And some Japanese strokers.. even the 4 strokes need TLC … and they are no where near as old!
It was all assembled with HG2000 on the threads . A slight spray helps keep the alloy threads in good nick, and Millers engine assembly l**e on all the vital bits.
Not much else to say really ..
except we wish good luck with the rest of the bike and as always we’re here to help in anyway we can right till the end and beyond the build.
But I will say … doing these bikes is not cheap… it can be cheaper but that means not doing stuff and ignoring things that I wouldn’t.. but it depends on your expectations personally for me it’s not the destination ,it’s the journey that gives the pleasure.. but assembling the engine with new bolts and nuts, keys and dowels, new circlips and bearings … on top of the major parts in freshly cleaned, stoned off gasket faces with oil ways checked .. is reassuring.. and to be honest… do it right and you will never need to do it again… not for a lot and lot of miles… but that’s the fun.. getting something dysfunctional and making it something you can enjoy and other’s envy… 😳😳😳😳

Here’s the finished repair to the badly cracked 1964 Triumph T120 head… the crack across the head face from the valve se...
30/10/2026

Here’s the finished repair to the badly cracked 1964 Triumph T120 head… the crack across the head face from the valve seat is now solid aluminium which to be honest is virtually undetectable..
Fully welded and peened to improve the density and strength prior to machining.. it has machined to a bright flawless finish.. we fitted new tubes in the inlet inner bolt holes to replace the original sealed in with 648, new inlet seats, colsibro guides and G&S valves…
Flip it over and the badly cracked corner 1/4BSF holes which clamp the outer edges of the Rockerbox … the 65O uses the inner 4 head bolts to clamp the Rockerbox down so these are just to help keep the oil in..a bit more😂😂😂😂🤣🤣
But people think that the answer is to cut out and fill with weld.. and re drill the hole… firstly Tig welding down a recess like that and getting complete fusion is impossible because the high frequency and current will try and arc to the nearest point, that being the top.. so the bottom won’t melt, if you cut more away then you will damage more of the surrounding features.. the best way is to cut out the crack and get to it as best you can fusing it and building it up as big as you can to add strength.. then using a slot drill open up the hole on position and tap it M10. x 1.0 and fit one of our HE30 alloy inserts that we make here. Then top them off to level, they are over long so they can be wound in with to bottom out and done FT gripped by a Vice grip plier , degreased it brake clean and loctited with 648 then centre drill- drill and tap 1/4 BSF .. the top is stoned of to blend .. we did all 4 threads.
All the guides are individually picked to give the same interference regardless of the guide hole size, then they are honed in situation to fit the carbide pilot giving 0.0015” clearance finally the seats are cut and vac checked.
All washed and cleaned, oiled and assembled with new springs
That whole job inc all new parts and VAT was £1100
As ive said before “ you can only p**s with the c**k you’ve got”
It’s nearly 63 years old and has had a major refurb after several interim repairs in the past.. but it is what it is.. we can only do our best with what we have

Address

Unit 3 Meadow Works Business Park, Kenton Road, Debenham. IP14 6RP
Stowmarket
IP146RP

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm
Saturday 9am - 5pm

Alerts

Be the first to know and let us send you an email when Seager Engineering posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Seager Engineering:

Shortcuts

Share

Nearby cars & car services