2 Stroke Innovation

2 Stroke Innovation Retro restoration and rebuild of 2 stroke motorbikes, specialising in Suzuki RGV 250's.

This is the end of the monumental build, many times over this period it's pushed me over and over, one step forward thre...
20/04/2026

This is the end of the monumental build, many times over this period it's pushed me over and over, one step forward three back and then back to the drawing board, and start again. Anyway it went from a 400 to a 500 build, every part has been rebuilt or changed which had to be the case as I started with scrap. Now it's off for mot and back to some normality untill a new idea takes over lol

Ibe been sorting the subframe,  seat , oil tank , and exhausts. Plenty of modifying but taking positive steps forward
23/05/2024

Ibe been sorting the subframe, seat , oil tank , and exhausts. Plenty of modifying but taking positive steps forward

Lower exhausts made to fit
02/05/2024

Lower exhausts made to fit

Frame polished and swing arm to do next
12/04/2024

Frame polished and swing arm to do next

This has been a very tricky project so far, but finally the new 500 engine has been installed using billet clutch cover ...
11/04/2024

This has been a very tricky project so far, but finally the new 500 engine has been installed using billet clutch cover and a resess for pv acuator. Ive had the electrics powering up. So next step is polish the frame and swing arm and get going with the rest of the build.

Well a busy few months sourcing parts and trying to move the build forward. Rewired rgv250 clocks to suit the 400 loom a...
19/02/2024

Well a busy few months sourcing parts and trying to move the build forward. Rewired rgv250 clocks to suit the 400 loom and first signs of life. First steps of progress

After a day of fettling ive finally got the engine in the optimum position. Cradle to make exhausts modifications to do,...
30/11/2023

After a day of fettling ive finally got the engine in the optimum position. Cradle to make exhausts modifications to do, very happy with progress

Ive been asked to finish and complete this rgv 400 build, nice to do somthing a little different for a change
20/11/2023

Ive been asked to finish and complete this rgv 400 build, nice to do somthing a little different for a change

P model is now finished with pics from then when i bought it, to now as it should be.
19/10/2023

P model is now finished with pics from then when i bought it, to now as it should be.

Been a while since i last posted but the p model is up and running, jist waiting on a few part to finish and then final ...
12/10/2023

Been a while since i last posted but the p model is up and running, jist waiting on a few part to finish and then final buttom up

Address

Silkmore Lane
Stafford
ST174JB

Website

Alerts

Be the first to know and let us send you an email when 2 Stroke Innovation posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share