13/12/2021
My new bench set up is starting to earn it's keep a bit now with the first few jobs rolling off it. Not literally rolling off it though. A Twin Crankshaft assembled and trued up, a pair of Cylinder M**fs fitted with new plus 30 O/D Liners, a new G2 plate fitted with new Bearings and G38 bush, a Cylinder M**f and Liner separated to check the interference fit and a front Cylinder Head ready to be stripped out for assessment. Not touched the Magneto parts yet. They are all Lucas K2F from BSA A10's and they all need the outer bearing races removing before they go off for vapour blasting along with about a dozen other K2F bodies that have already had the Bearing Races removed.