JM-Performance

JM-Performance JM-Performance can offer you custom fabrication and installation of automotive accessories and modif

Trolleys I fabricated for Airbus a few weeks back.Please get in touch for all your fabrication/welding 📞📩
28/11/2018

Trolleys I fabricated for Airbus a few weeks back.

Please get in touch for all your fabrication/welding 📞📩

Modified a Landover inlet manifold today so the customer can run a water intercooler ✅
28/11/2018

Modified a Landover inlet manifold today so the customer can run a water intercooler ✅

Go Kart under belly drawn and cut on the CNC plasma today 🙌✅
28/11/2018

Go Kart under belly drawn and cut on the CNC plasma today 🙌✅

Last job before christmas was this 316 super bright stainless steel heat duct for a fire pitt in a customers house 😊
24/12/2017

Last job before christmas was this 316 super bright stainless steel heat duct for a fire pitt in a customers house 😊

Slowly getting there with sorting out the workshop ready for the new year. Just the garage area to paint now and some li...
08/12/2017

Slowly getting there with sorting out the workshop ready for the new year. Just the garage area to paint now and some lights in the workshop area and ill be good to go. Unfortunatley i am booked up from start of feburary for around 6-7months but will hopefully be able to fit other jobs in around the project i am working on over that period. However if anyone needs any jobs doing between now and then i have some time so get in touch. Thanks.

Thanks to Josh Price for all the hard work in helping me for the past few weeks to get the shop cleared out and painted etc.

23/11/2017

Have tomorrow free if anyone needs any fabrication/welding work doing. Get in touch asap! Thanks.

Had a Busy week! Fabricated 16 of these trolly frames for airbus.
16/11/2017

Had a Busy week! Fabricated 16 of these trolly frames for airbus.

From 6mm mild steel tanks last week to this 2mm stainless steel hopper. This will sit above a shaker which all different...
02/11/2017

From 6mm mild steel tanks last week to this 2mm stainless steel hopper. This will sit above a shaker which all different types of nuts are filtered through and checked for metal in the prodct etc. The hopper is sat on a 50x50x3mm box section frame at 1800mm from floor level. Nuts are fed from above and hopper filled untill full. I Have fabricated a sliding door so the users can stop the flow once the shaker has reached correct level. It is bolted to the floor with raw bolts to ensure correct position.

Please be sure to contact for any fabrication/welding ✔😊

Prototype trolly frame done for airbus. The original design was to bolt the top frame to an exisiting trolly but then cu...
31/10/2017

Prototype trolly frame done for airbus. The original design was to bolt the top frame to an exisiting trolly but then customer decided they would prefer to have JM performance fabricate the job as a whole and make the trolly as well. So if we do any more i will encorperate the bottom frame into the top frame. Nice to see a job from the start to the finished product. Just needs bolting together and to fit the handle ✔

Put this Frame together for airbus today. Prototype for them to test and trial.
23/10/2017

Put this Frame together for airbus today. Prototype for them to test and trial.

Busy week for JM-Performance. Working on these custom oil tanks. 2 built this week and another 3 to complete next week. ...
14/10/2017

Busy week for JM-Performance. Working on these custom oil tanks. 2 built this week and another 3 to complete next week. 🐐

Address

66 Old Bidston Road
Birkenhead
CH418BL

Opening Hours

Monday 8am - 6pm
Tuesday 8am - 6pm
Wednesday 8am - 6pm
Thursday 8am - 6pm
Friday 8am - 6pm
Saturday 9am - 2:30pm

Telephone

+447983771175

Website

Alerts

Be the first to know and let us send you an email when JM-Performance posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share