29/05/2026
A lot of work done in this BMC frame, the client contact us about a frame crack and a posible paint job and cable integration, all done by us at our facilities in Barcelona, first we strip all the paint from frame and fork, the second step was to repair the damage and redesign the cable routing the last step was this amazing paint job with candy colors to show the raw carbon fiber under the paint.