Precise Yacht Management

Precise Yacht Management Site supervising, finish carpentry, customs, marine services. supply and install renovation to the greater Vancouver area.

When the only question is how much time do you need. Vessel length 60’. Project length 1 month. Original hatches and som...
04/06/2024

When the only question is how much time do you need. Vessel length 60’. Project length 1 month. Original hatches and some steps made with teak plywood rather than solid teak. We replaced the plywood with solid teak and sanded all the decks to bring back that beautiful look and feel. We sell custom cut teak decking material by the foot, as well as install just about any teak product on a vessel.

Swimgrid repairs completed above factory spec. Tapered boards used to hide the fact that the original pattern is out of ...
04/06/2024

Swimgrid repairs completed above factory spec. Tapered boards used to hide the fact that the original pattern is out of square. Each of the boards used to fill the gap was slightly tapered to account for a 1/4” total deviance from alignment. This way the final product has no obvious pattern discrepancy. Project length 10 days. We only use the highest grade teak epoxy to adhere our decks because it does not leach harmful chemicals into the environment. We do small repairs such as this right up to full teak deck replacements and sanding.

Back in the water you go. Another vessel ready just in time for the good weather. I enjoy a good Marquis and this one wa...
06/22/2023

Back in the water you go. Another vessel ready just in time for the good weather. I enjoy a good Marquis and this one was fun to drive. Three IPS drives on her made for super easy docking.

Back in the water just in time for the sun. Always fun to watch them go back in ready for another 4 seasons.
05/16/2023

Back in the water just in time for the sun. Always fun to watch them go back in ready for another 4 seasons.

It has been awhile since I’ve finished one of these. Quick Christmas gift for the boses boss. Blue dyed Maple burl.
12/19/2022

It has been awhile since I’ve finished one of these. Quick Christmas gift for the boses boss. Blue dyed Maple burl.

This one, started October finished in January, I completed site supervisor, project coordinator, management supervisor 😉...
04/29/2020

This one, started October finished in January, I completed site supervisor, project coordinator, management supervisor 😉 (31 people in management and 28 tradesmen this does not include staff after opening, changes to drawings up to last moment), concrete work, carpentry, metal work and fabric work. Working at Mekanix contracting for this project. No longer DBA as Von Bessa Construction. I am currently working in both the finishing carpentry of retail spaces and marine technician work.

Another paint job complete. Looks like a Monk 48’, mahogany hull painted with custom colour.
06/24/2019

Another paint job complete. Looks like a Monk 48’, mahogany hull painted with custom colour.

Welcome to another paint job on another beautiful wooden boat, 48’ long and in great shape for her age. Ready for hull p...
05/25/2019

Welcome to another paint job on another beautiful wooden boat, 48’ long and in great shape for her age. Ready for hull paint.

Sneak peak. Prime coat ready. Time to build up the metallic red, Bump rail and top coat up next. Cal20 James Bond style ...
04/30/2019

Sneak peak. Prime coat ready. Time to build up the metallic red, Bump rail and top coat up next. Cal20 James Bond style fully restored. Her name is a secrete at the moment but it has been chosen.

Address

Vancouver, BC
JJJ

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Website

Alerts

Be the first to know and let us send you an email when Precise Yacht Management posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category