15/07/2026
π FIRST JOB THROUGH THE DOORS.
Scania prime mover β mine site compliance job. In and out same day.
Customer needed mine site access sorted: starter isolator and remote engine stop fitted to spec. While it was in, an engine fault came up too β traced it back to a faulty overflow valve, replaced, cleared.
No guesswork, no leaving it on the hoist for a week. Diagnosed, fitted, tested, back on the road.
If this is the standard you want on your fleet, get in touch.
π 7/30 Deviation Way, Neerabup
π 0423 858 801
West Fleet Care β Heavy Vehicle Services