29/05/2026
The week that was @ Dubsmith Garage π€
β66 11 Window - Reconditioned gearbox internals removed so case can be painted to make it look top-notch. Plenty more fit out works happening engine getting close to being installed once gearbox is assembled back together and bolted in place in the vehicle.
β64 11 Window - More fit out works being completed. All brake lines underside completed with a little twist of difference showcasing some attention to detail works that we quite like doing. Engine to wear to be prepped next week and coloured out ready to then assemble and plug the engine back in for a final run up.
β60 Shannons Insurance Job - Exterior coloured out two tone and clear coated and looking 100% better than when it first came in. Next up is for it to go onto the hoist to have the underside repairs painted and completed. Once that is done mechanically it will be reassembled and handed back to the owner.
β63 11 Window - S**t loads of mechanical prepping taken place this week and coloured out in a beautiful grey gloss finish. Engine tinware up next to be painted with plenty of tinware prep work to be ticked off throughout the coming week.
β56 Oval Beetle - Passenger side a pillar replaced and looking spot on. Rear Balance removed, side fender wings being replaced. Driver-side reoffending replaced and looking perfect again. Passenger side rear fender wing up next to be completed early next week.
β74 Baywindow - Final tasks being attended to. Some annoying rust found under the side flipper window. New metal replaced back into it and complete now. Pop top roof cut into place, and pop top transferred over into the replacement vehicle now ready for its final road test and some minor rubber seal works, then handover to its owner to carry on its works back home.