Offshore Rafting

Website

Offshore Rafting INFLATABLE BOAT REPAIR
Sebastian, FL. Pick up/delivery available.

INFLATABLE BOAT REPAIR: Servicing dinghies and rigid hull inflatables (RHIBs) in the recreational, military, and professional markets

10/19/2026

NAUTICA INITIAL INSPECTION…

for air leaks, detachment, worn fabric, etc.

10/19/2026

WATER INTRUSION PORTION…

of the Nautica inspection.

10/19/2026

HIGHFIELD AIR DECK INITIAL INSPECTION…

I don’t see signs of potential failure along the lateral seams, but I do expect to see leak migration around the collar.

10/15/2026

SATURN INITIAL INSPECTION…

It’s a shame this happened to a brand new dinghy.

STRIKING TRANSFORMATION…if I do say so myself!
10/13/2026

STRIKING TRANSFORMATION…

if I do say so myself!

FOR SALE…$8,300 O/B/O2014 AB 10VSX30HP Tohatsu engine is not currently in working order, and is not included in the sale...
10/13/2026

FOR SALE…

$8,300 O/B/O

2014 AB 10VSX

30HP Tohatsu engine is not currently in working order, and is not included in the sales price.

Sale DOES include a 2007 Karavan trailer in mint condition.

The vessel came to us with 3 leaks. Those have been repaired. Reinforcing patches have been placed. We gave the boat an intense cleaning, as well.

Owner is willing to split the package. If you wish to schedule a peek, please call 252-571-0421.

10/13/2026

ACHILLES FINAL REVIEW…

The repair portion was a cinch; nothing to it. The cleaning was another story. It took a ton of work to restore the tubes!

10/11/2026

ANOTHER ACHILLES INITIAL INSPECTION…

I don’t yet know what’s hiding under the DIY area, but I sure as hell am happy to find tape there (as opposed to 5200)!

10/10/2026

IF YOU CAN’T BE A MULTITASKER…

you’ll never survive in this field. It’s been a whirlwind couple of days, but every one of ‘em was chock-full of efficiency, productivity, and great results.

Intakes, inspections, prep, gluing, cleaning, painting, bidding bon voyages, appointment scheduling, and shuffling boats around; all of it went smoothly, and without stress.

The initial plan with Kevin’s boat was for me to pull an all-nighter in order to deal with the handles, transom holder, and seam reinforcing strips. Thankfully, with the addition of both top and bottom cleaning, and the extra cosmetic patches, I was granted a reprieve. I started on Thursday, and wrapped up today. That bottom cleaning took almost all day yesterday! I did what I could to de-barnacle the outboard too.

I hope Kevin and his wife feel the dinghy is so unrecognizable, Driver Bert must’ve stolen one and pulled a swap out!

10/09/2026

YESTERDAY’S SHIFT…

was a long, but productive one. I put all 6 cosmetic patches down, then tackled all 6 handles.

I dealt with the transom holder, rubrail detachment, and scrape on the starboard tube, as well.

Today, I decided I’d like to reinforce the transom holder. I pulled it, placed a patch, then prepped and glued it back down.

I want to visually explain why it’s so important to remove the adhesive from the handles. If I don’t show you what’s up tomorrow, please remind me!

Address

Sebastian, FL

Alerts

Be the first to know and let us send you an email when Offshore Rafting posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share

Category