09/15/2017
This week at the shop, stage one of turning your work truck into a UFO.... Scott Coffman Jeff Christman
(Dual, separated battery banks with a master key to bridge the two banks and charge the rear from an alternator. Fully customized built power distribution center, with in cab switch panel. Two separate volt meters for each bank, and lights for days. Front running light bar, driver/passenger side bed pods, driver/passenger side work light bars, and in bed lights that double as reverse lights. Also diesel fuel cell and pump direct wiring, and electric start compressor.)
Next week comes the inner tool box lights.