04/26/2026
Repair work on this 1986 Cape Dory 32 that was damaged in a December Nor’easter storm.
Gel coat repairs, fiberglass work, replaced 6 ft of teak toe rail and 12+ ft of teak rub rail made to match and cut, metal rub rail trim machined to match fastener hole pattern and mounted.