Rotten Metal Garage & Welding, LLC

Rotten Metal Garage & Welding, LLC We're all about hot rods and welding! We're also dealers for Ridetech, Forgeline, Baer Brakes, and Bowler Performance Transmissions!

More shop updates... We had gutters installed, the concrete bridges were poured, we have water, all the lights are in, a...
09/24/2026

More shop updates... We had gutters installed, the concrete bridges were poured, we have water, all the lights are in, all outlets and light switches are in, I hung a neon sign 😁, and the trailer is parked in it's new home! Next up is sealing the floor, and dirt work, which probably won't happen until November.

Some more shop stuff... all fans are in, almost all outlets and switches are in, and Big Boy moved in!
09/15/2026

Some more shop stuff... all fans are in, almost all outlets and switches are in, and Big Boy moved in!

More shop updates... the interior metal is done, the boiler is in, most of the electric outlets are in, some light switc...
09/10/2026

More shop updates... the interior metal is done, the boiler is in, most of the electric outlets are in, some light switches are in, one ceiling fan is in and operational, all three garage doors and openers function, and both coach lights function. I still need to connect the water, install two more ceiling fans, and finish the outlets and switches.

Not a lot to share, but I couldn't handle the blue door so I shot some black primer on it. I also installed the passenge...
08/30/2026

Not a lot to share, but I couldn't handle the blue door so I shot some black primer on it. I also installed the passenger side rear trim and molding. While the bumber was off, I cleaned the years of dirt and surface rust off the back side, painted it, and put new hardware on the bumper bolts. The engine and underside pics are just because!

Almost done with the septic system!  The alarm and pump need to be installed, the water supply needs to be connected, an...
08/26/2026

Almost done with the septic system! The alarm and pump need to be installed, the water supply needs to be connected, and finally, we'll have screened topsoil brought in to even things out.

Underground boring for the water supply today...
08/20/2026

Underground boring for the water supply today...

Good progress today!
08/19/2026

Good progress today!

08/19/2026

So many true statements! 😆

Tomorrow the septic system install starts and some parts for the Corvette LS engine build arrived!
08/19/2026

Tomorrow the septic system install starts and some parts for the Corvette LS engine build arrived!

Address

Jasper, IN

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm
Saturday 9am - 5pm

Website

Alerts

Be the first to know and let us send you an email when Rotten Metal Garage & Welding, LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Rotten Metal Garage & Welding, LLC:

Shortcuts

Share