Fellten

Fellten Charge Qube by Fellten delivers rapidly deployable battery storage and EV charging solutions for fleets, infrastructure and industrial sites.

Deploy in hours, reduce emissions, avoid grid upgrades and power operations with scalable UK-engineered systems.

21/05/2026

is now the bottleneck. aren’t waiting on EVs anymore. They’re waiting on , grid upgrades, and enough available power to actually deploy at scale.
That’s exactly why we built .
A rapidly deployable battery energy storage and EV charging platform designed to deliver ultra-rapid charging, temporary power, energy resilience, and fleet electrification… without waiting 18 months for the grid!
No major groundworks.
No diesel generators.
No excuses.
Built in Britain by the team at Fellten
ChargeQube.com
[email protected]

We’re growing and looking for new talent to join the team at Fellten. As demand accelerates around   and our EV charging...
20/05/2026

We’re growing and looking for new talent to join the team at Fellten. As demand accelerates around and our EV charging & energy infrastructure projects, we’re expanding across:
- Sales & Business Development
- Field Service Engineer for EV / Charging Infrastructure
Join a fast-moving team helping shape the future of electrification, charging infrastructure, and deployable energy systems.
Bristol / Yate based
More info here:
Gerrell & Hard x Fellten Careers
CVs / enquiries: gerrellandhard.co.uk/partners/fellten/

fans

15/05/2026

From grid limitations to rapid deployment charging.
EVO helps unlock EV infrastructure where traditional installs simply can’t move fast enough.
No major groundworks. No long DNO delays. Just scalable power and charging where it’s needed (Ultra-Rapid CCS+AC outlets)
Built in the UK. Designed for the real world.
ChargeQube.com
[email protected]

11/05/2026

The biggest EV dealership bottleneck nobody talks about?
POWER SUPPLY!
Not the cars.
Not the customers.
Not the demand.
The infrastructure.
More EVs are arriving. More demo fleets. More pressure from expanding EV line-ups.
Yet many dealerships still can’t properly charge the vehicles they’re trying to sell.
That’s exactly why we built .
A deployable “Grid In A Box” delivering instant EV charging infrastructure without major works or long grid delays.
Simply connect to your existing supply, even modest 32A 3-phase, and start rapid charging vehicles up to 240 kW.
From 100 kWh to 450 kWh systems, Charge Qube helps dealerships:
✔ Launch new EV brands faster
✔ Charge demo and customer vehicles immediately
✔ Avoid expensive infrastructure upgrades
✔ Scale EV operations site by site
The dealerships solving power first will win the EV transition.
www.chargeqube.com

06/05/2026

One of the most exciting things happening in the automotive world right now is seeing traditional restoration and engineering workshops evolve into high-end EV conversion specialists.
Fantastic to see Jaunt featured on national TV in Australia, showcasing the level of craftsmanship, technical expertise, and attention to detail now driving the EV conversion industry forward.

Proud to see Fellten battery systems helping power projects like these and supporting builders around the world who are proving that electrification and automotive passion can absolutely coexist.

02/05/2026

Most temporary power or even temporary EV charging still relies on one thing nobody talks about: Diesel generators.
So while the vehicles may be electric… the infrastructure behind them sometime isn’t.
That’s exactly the problem was built to solve.
Portable battery energy storage with integrated CCS charging!
No diesel.
No fumes.
No noise.
No waiting years for grid upgrades.
Deployable in hours and ready to support fleets, events, depots, infrastructure projects, and real-world electrification where power is the bottleneck.
The EV transition does not fail because of vehicles.
It fails because of infrastructure.
We’re fixing that: ChargeQube.com

29/04/2026

aren’t being held back by vehicles. They’re being held back by POWER.
Grid delays. Limited capacity. Months, sometimes years, to get connected. That’s the real bottleneck. cuts through it.
A deployable, containerised energy system with integrated rapid charging and AC capability, built to get fleets moving now:
NO grid upgrades, Live in HOURS, not months!
From logistics and last-mile delivery to public sector, construction, and live events, it enables electrification where the grid simply can’t.
That’s exactly why we’re working with forward-thinking fleet partners like Ayvens to accelerate EV adoption where it matters most.
chargeqube.com

Big thanks to the one and only Paul Kirby and theevcafe team for stopping by the Ayvens  stand to review the   in action...
28/04/2026

Big thanks to the one and only Paul Kirby and theevcafe team for stopping by the Ayvens stand to review the in action.
Powering vans, fleets and EVs across the country when the grid can’t keep up.
Catch the moment here:

54 likes, 4 comments. "The is back bigger and stronger than last year - Plenty electric too "

27/04/2026

Most EV plans look great… until you hit the power wall.
This is the fix. : instant energy, rapid charging, zero waiting on the grid.
No groundworks. No delays. No diesel.
Deploy it. Plug in. Get moving: CCS+AC, all in a 10'' container: available now.
If your fleet depends on POWER, this is the conversation.

We’re live at the Commercial Vehicle Show with Ayvens… and the conversation has already moved on.It’s not about vehicles...
22/04/2026

We’re live at the Commercial Vehicle Show with Ayvens… and the conversation has already moved on.
It’s not about vehicles anymore.
It’s about how FAST you can deploy.
Yesterday, one question kept coming up: “How quickly can this go live?”
So today, we’re showing it.
Charge Qube. Open. On the stand.
Ready to deploy.
Hall 5 – Stand 5E112
Come take a look inside. Literally.

Address

Yate

Alerts

Be the first to know and let us send you an email when Fellten posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share